TM 1-2840-252-23-2
4-45 INSTALL NO. 4 AND 5 BEARING OIL TUBES (AVIM) (Continued)
4-45
(2) Install oil tube fixture (T45) (23)wo 1/4
t
x 28 bolts (24) and 1/4 x 28 nuts (25) on
nozzle flange (26) at the 1 2-o'clock posi-
tion
(3) Thread reducer (27) into oil pressure
tube adapter (21 until adapter (21 ) is
)
firmly seated in oil tube fixture (T45) (23)
GO TO NEXT PAGE
4-240