TM 1-2840-252-23-2
4-36 INSPECT FOURTH STAGE POWER TURBINE ROTOR (AVIM) (Continued)
4-36
5. Install induction heater (T21) (17) n fourth stage
o
power turbine rotor (4).
6. Connect control unit (T29) (18)o induction heater
t
(T21) (17).
GO TO NEXT PAGE
4-148