TM 1-2840-252-23-2
4-36 INSPECT FOURTH STAGE POWER TURBINE ROTOR (AVIM) (Continued)
4-36
3. If removed, install ring spacer (7) on shaft (1) and
against faceplate (3).
4. Install holding fixture (T30) (12) n fourth stage
o
power turbine rotor as follows.
a. Remove two pins (13) and separate halves (14) of
holding fixture (T30) (12).
b. Install halves (14) of holding fixture (T30) (12)
on hub (15) of fourth stage power turbine rotor
(4) just under splines (19).
c. Install two pins (13) in holes (16).
GO TO NEXT PAGE
4-147