TM 1-2840-252-23-2
3-10
ASSEMBLE COMBUSTION SECTION (AVIM) (Continued)
3-10
3. Install ring (4)and six screws (5).
4. Position combustion chamber liner (6) with start fuel
nozzle holes (7) aligned with holes (8) in combustion
chamber housing (9).
GO TO NEXT PAGE
3-124