TM 55-2840-254-23
1-115 REPRESERVE ENGINE IN STORAGE OVER SIX MONTHS (Continued)
1-115
8. Preserve and prepare engine (6) for shipment or
9. Stencil new preservation and inspection date
on rear of shipping and storage container using
white enamel (E57) and black enamel (E8)
as shown.
INSPECT
FOLLOW-ON MAINTENANCE:
Install Engine Into Shipping and Storage Con-
Mark Shipping and Storage Container
END OF TASK
1-622