TM 1-2840-252-23-2
6-19
INSTALL LEFT- AND RIGHT-HAND FUEL MANIFOLD ASSEMIEL (Continued)
BS
6-19
CAUTION
In following step 9, seals must be fully
seated and must be squarely against
nozzle flanges Failure to comply will
section, damage and leaks.
9. Install 14 seals (1) on 14 nozzles (2) on righthand fuel
manifold assembly (16).
GO TO NEXT PAGE
6-75