TM 1-2840-252-23-2
4-60
INSPECT SECOND TURBINE NOZZLE, PACER, CASE, AND BUMPER (AVIM) (Continued)
S
4-60
Inspect sealing baffle (42)There shall be
i.
no cracks.
Inspect aft side of second turbine nozzle (1)
2.
as follows:
Inspect aft surfaces (43)or severe
a.
f
damage There shall be no damage deeper
than 1/16 inch.
GO TO NEXT PAGE
4-330