TM 1-2840-252-23-2
4-29
INSPECT THIRD TURBINE NOZZLE AND SUPPORT (AVIM) (Continued)
4-29
(3) There shall be no more than 20 cracks (36)
extending from vane slot (37) past aft edge
(38) to braze line (39).
d. Inspect 16 rivets (40). There shall be no more
than 40 percent of rivet material missing (41).
GO TO NEXT PAGE
4-120